The above picture is opening up the lattice work wall. You can see the first yurt in the background . We started Friday about noon and got all the wood structure assembled about 6 PM. Jim Haney, Greg Schultz, Steve Aamold and my self worked that afternoon.
Rafters are installed
Working on the roof skin Saturday. Stan and his son Steve joined us
Here we slide the dome up to the top. I did not think we would get this far.
This picture shows the inside of the first yurt with the bunk beds installed.
We pushed a little to get the second yurt up before the fall rains came. There is a little more work to be done on the decks where we will construct bench seats on the outside and some railing.
These pictures were taken by Steve Aamold