Friday, March 7, 2014

Framers are coming, lets auger some holes March 1 and 2

Eric came down to help get the tractor back up and running. That went well. It  was a rain off and on sort of Saturday. About 3 in the afternoon we started drilling.

 We had tarps down trying to protect the 10 hole we did the weekend before. Our neighbor Danny came over to join the adventure. When the auger quit cutting we would move to the next location and try to fracture the bottom of the hole with the digging bar.
We had to do this on maybe 8 holes. They would glaze over and the 12" auger would stop cutting.
We plugged away and got 25 holes drilled, which was one Yurt decks worth. Had fun as well. Somehow I did not get pictures of Greg and Steve helping on Sunday. We drilled 25 holes and the second pad was ready for the framers.