One deck is getting framed while the far one has the yurt floor installed. The storm of 3 weeks ago did no damage, just postponed things a bit.I did have a tarp on some plywood with 2 pallets holding it down. The winds blew the pallets off.
Marking out the 10' radius. Terra Redondo is in the background. Great view to the east from this Yurt.
Here they are installing the Trex decking. Most of the pieces have to be cut with a radius end so it fits up to the raised deck.
Then there is food. Not very cold but the fire is a nice addition. The dome in the back right is the top to one of the new yurts