Saturday, July 30, 2011

A step forward on the zipline

Friday afternoon we took delivery of a load of rock. We need to have some soft fall protection material under the travel way and will use the rock to contain that material.

Now we need to spread them out and line them up. We have 2 different tractors we can use to move them around . They generally are football size so they  should not be very heavy. Just some work turning 2 piles into 2 lines.
So the rocks will be placed in rows 12 ft a part and parallel with the zip line, then fibar will be added between the rows. Thanks for looking at our progress.