It was pretty quiet at 7 AM
Work on the deck continued
They set wire to hold the insulation in place, this is the westerly deck
Then insulation which will be directly under the yurt
Plywood tongue and groove deck, students provided the manpower for these heavy sheets
Just needs a little trimming and an 8 inch strip of OSB plywood around the perimeter and we can start putting the yurt up.
While some worked on the yurt deck, Emmit graded the volleyball court, bocce ball and basket ball court.
He works magic with that small tractor
With 80 students and some adults the dining pavilion is a full house for lunch.
Victory circle is always a sweet time with music a some teaching after dinner.
They all went into town today for church services. Tomorrow starts the vacation bible school programs and other activities in King City.